Skip to main content

Hoover Dam Bridge, March 27, 2011

 Item — Object: 116

Scope and Contents

Bill Dowd, P.E. from HDR (retired) was the design team project manager for the Hoover Dam bridge. Listen to the unusual construction methods for this 1900 foot bridge that is 900 feet above the canyon floor. Watch the time-lapse photographic record of the construction. 

Dates

  • March 27, 2011

Creator

Conditions Governing Access

The collection is open for research use.

Extent

1 Digital Files : MP3 audio file

Language of Materials

From the Collection: English

Repository Details

Part of the University of Missouri-Kansas City Special Collections and Archives Repository