Skip to main content

Town Fork Creek Combined Sewer Improvements, November 28, 2010

 Item — Object: 99

Scope and Contents

Paul Anderson, P.E. joined the show to share the plans for improving the sewer service in the Town Fork Creek watershed. Town Fork Creek flows NE into Brush Creek, near the Bruce Watkins Center. The plans include a deep tunnel which will be connected to the Brush Creek tunnel -- the two tunnels can help reduce flooding and overflows cooperatively. The Town Fork Creek plan also includes some sewer separation with that stormwater flow going to a local green solution for infiltration. More details are laid out in the Overflow Control Plan, which was recently finalized. 

Dates

  • November 28, 2010

Creator

Conditions Governing Access

The collection is open for research use.

Extent

1 Digital Files : MP3 audio file

Language of Materials

From the Collection: English

Repository Details

Part of the University of Missouri-Kansas City Special Collections and Archives Repository