Brush Creek Feasibility Study, May 2, 2010
Scope and Contents
Brian Rast, P.E. and John Grothaus from the Kansas City District of the U.S. Army Corps of Engineers joined the show to talk about the future of Brush Creek. One of the advantages of federal involvement is that both Kansas and Missouri entities are part of the discussions. The drainage area for Brush Creek is nearly divided evenly between the two states. The Corps is exploring options for restoring some aspects of its ecosystem, so Deb asked how that would interface with the constructed flood control channel, specifically the drop structures and dams.
Dates
- May 2, 2010
Creator
- From the Collection: O'Bannon, Deborah (Person)
Conditions Governing Access
The collection is open for research use.
Extent
1 Digital Files : MP3 audio file
Language of Materials
From the Collection: English
Repository Details
Part of the University of Missouri-Kansas City Special Collections and Archives Repository